Tanggal | Tempat | Kota |
---|---|---|
Belum ada jadwal terbaru |
Instructor by: Cecep Slamet Abadi, ST
24 – 26 Juni 2014, New Saphir Hotel, Yogyakarta
19 – 22 Mei 2014, Jogjakarta Plaza Hotel, Yogyakarta
OVERVIEW
Periodically, all industrial equipment including turbines require a major overhaul. The level of work required for repairs will depend a lot on the operating conditions such as fuel quality, combustion air and how the unit is loaded. Improvement in order to run smoothly and to complete all necessary work, planning should begin long before repairs begin.
OUTLINE
A. Introduction
B. Preparation
C. Basis for Opening Turbine
D. Disassembly and Repair
E. Field machining procedures
F. Coupling boltholes Casing splitline gap in the low pressure section
G. Reassembly
H. Conclution
TRAINING METHOD
Presentation
Discussion
Case Study
Evaluation
FACILITY
Training Kit
Handout
Certificate
Lunch + 2 X Coffee Break
Souvenir
Data Materi Training | |
Topik Training | : Proses Overhaul Turbine |
Link | |
*Jumlah Peserta | Estimasi Jumlah Peserta yang di ajukan |
*Nama Peserta Yang Didaftarkan | |
Personal Data | |
*Nama | |
*Jabatan | Jabatan/Divisi/Departement |
*Nama Perusahaan | |
*Alamat Perusahaan | |
*Email Perusahaan | |
*Email Alternatif | eg: gmail, yahoo, hotmail |
*Telepon Kantor | |
Ekstensi | |
*Handphone | |
* Harus di isi | |
![]() | |